Posted: Thu Jan 03, 2008 5:14 pm
by ooaam
i have problem to control required material i create job and system calculate required material for job but i carry the waste the job for that the required not equal issue and try to move scrap but system do not cost it to FG item
how can i manage it

Posted: Thu Feb 14, 2008 1:58 am
by erpprabhu
HI,
What costing method u follow?
may know the wip component return(scrap) workflow u follow ?

Regards,
Prabhu.D
Apps Functional Consultant.

Posted: Thu Feb 14, 2008 4:14 am
by ooaam
Average cost